Our civil engineering project expertise
Civilcore Limited completes infrastructure work in Castledawson using a hands-on, integrated approach. Each scheme is managed in-house, from initial inspection through technical assessment, design, and delivery, so clients never need to juggle multiple contractors. Partnering with Civilcore Limited keeps your vision central, with solutions tailored to the distinct requirements of commercial, industrial, or public-sector sites. You'll work with a workforce that is fully trained and safety-accredited, ensuring the highest compliance standards. The team operates throughout Northern Ireland, the Republic of Ireland, and the UK, making them an excellent choice for both local and cross-border developments. Ongoing advice and straightforward leadership mean work is completed on time and to specification. Our civil engineering capabilities provide the structural foundation for specialist surface installations, ranging from high-strength concrete and paving to professionally prepared resin-bound driveways.
McDonald's - Derby
Works Completed:
-
Internal and External Drainage
-
Concrete Reinstatement
-
Blacktop Surfacing
-
Kerbing
-
Paving
Timeframe: 14 Weeks

Fibre Installation - (ROI - Various)
Works Completed:
-
Track Excavation
-
Spoil Removal
-
Duct and Sub-Duct Installation
-
Concrete Reinstatement
-
Blacktop Reinstatement
-
Grass Verge Reinstatement
Timeframe: Ongoing

Roadway Planing & Surfacing
Works Completed:
-
From Planning To Completion
-
Road Planning and Removal
-
Blacktop Surfacing
-
Bitumen Sealing
-
Line Marking
Timeframe: Ongoing

Kilronan Primary School
Works Completed:
-
Site Clearance
-
Excavation Works
-
Deep Drainage
-
Foundations
-
Blacktop Surfacing
-
Concrete Reinstatement
Timeframe: 6 Months

McDonald's - Saltcots
Works Completed:
-
Concrete Reinstatement
-
Blacktop Surfacing
-
Resin Bound Surfacing
-
External Drainage
-
Foundations
Timeframe: 3 Weeks

Resin Driveway - Belfast
Works Completed:
-
Blacktop Surfacing
-
Resin Bound Surfacing
Timeframe: 1 Week

McDonald's - Tunstall
Works Completed:
-
Demolition Works
-
Concrete Reinstatement
Timeframe: 1 Week

Resin Driveway - Belfast
Works Completed:
-
Paving
-
Blacktop Surfacing
-
Resin Bound Surfacing
Timeframe: 1 Week

McDonald's - Blackburn
Works Completed:
-
Internal and External Drainage
-
Concrete Reinstatement
-
Blacktop Surfacing
-
Kerbing
-
Paving
-
Fencing
-
Landscaping Works
Timeframe: 16 Weeks

McDonald's - Hartlepool
Works Completed:
-
Internal and External Drainage
-
Ducting
-
Concrete Reinstatement
-
Kerbing
-
Paving
-
Fencing
Timeframe: 16 Weeks

Resin Driveway - Ballymena
Works Completed:
-
Driveway Clearance
-
Driveway Preparation
-
Kerbing
-
Blacktop Surfacing
-
Resin Bound Surfacing
Timeframe: 2 Weeks

McDonald's - Wishaw
Works Completed:
-
Internal and External Drainage
-
Ducting/Track Works
-
Concrete Reinstatement
-
Blacktop Reinstatement
-
Paving
-
Kerbing
-
Fencing
-
Landscaping
Timeframe: 14 Weeks

McDonald's - Tallaght, Dublin
Works Completed:
-
Blacktop Surfacing
-
Bitumen Sealing
-
Line Marking
Timeframe: 1 Week

Private Driveway - Glengormley
Works Completed:
-
External Drainage
-
Ducting
-
Concrete Reinstatement
-
Kerbing
-
Fencing
Timeframe: 6 Weeks











































































































































































